USE CASE · FIXTURE DESIGN & CAM

12 parts, one setup: tombstone with manual clamps.

Design of the clamps on the tombstone and CAM programming of all four sides in one program, simulated including fixtures and machine.

4 sides × 3 parts Manual clamps hyperMILL [Client / industry anonymised]
TOMBSTONE · 12 PARTS 4 SIDES · ALL ROUND
STARTING POINT

Each part clamped individually

The parts were clamped one at a time in a vise. After each part the machine stood still until it was re-clamped and touched off. Setup time and operator effort exceeded the actual machining time. [Add specific starting point]

GOAL

More parts per setup

As many parts as possible in one setup, longer unattended running and one program that machines all parts reliably one after another. Without expensive hydraulic workholding.

FIXTURING CONCEPT

Four sides, three clamps each.

Tombstone Spindle Part + clamp Top view · rotary table turns 4 × 90°
Top view: the rotary table turns the tower side by side to the spindle.
fixedjaw Spindle+ tommy bar machined Side view · 3 parts per side
Side view: fixed jaw on the tower, movable jaw via spindle with tommy bar.
APPROACH

From clamp design to program.

  1. 01

    Fixturing concept

    Layout on four tower sides with three parts each. Clamping faces, access for tool and wrench and interfering contours are defined first.

  2. 02

    Clamp design

    Manual clamps with fixed and movable jaws in CAD, matched to the stock and the tower grid. Jaws designed so the part locates repeatably.

  3. 03

    CAM program

    All 12 parts in one hyperMILL program. Side changes via the rotary axis, part-by-part machining with an optimised tool sequence.

  4. 04

    Simulation & prove-out

    Machine simulation with tower, clamps and tool holders. Collisions are resolved on screen before the program goes to the machine.

RESULT
12
parts per setup instead of one
1
program for all four sides
CALCULATOR

Do the maths: does a tombstone pay off?

Enter your own values. Every field can be changed, results update instantly.

MACHINING
SingleMachine waits while clampingTombstoneMachine waits while reloadingPallet changer2nd tower is loaded while the 1st one runs
Time per part–––
vs. single–––
Machine idle per part–––
Machine runs unattended in one block–––
Parts per shift–––

Tool change time per part: –. Assumptions: on the tombstone each tool is changed in only once for all parts (same machining per part). Indexing the tower between sides is included in the machining time. Guide values, no guarantee.

Robot, pallet storage, unattended night shift?
The automation calculator compares standalone, pallet changer, pallet and part handling – with parts per day, cost and payback. Available as a PDF report.
Open the automation calculator

Similar parts, too much setup time?

Send me the part and machine. I will check whether a tombstone or multi-part fixturing pays off.

Use case: bone plates Request a project